All Issue

2020 Vol.10, Issue 2 Preview Page

Scientific Paper

31 December 2020. pp. 172-195
Abstract
References
1
Abu Abdo, A.M., Bayomy, F., Nielsen, R., Weaver, T., Jung, S.J. and Santi, M. (2010). “Development and evaluation of hot mix asphalt stability index”, International Journal of Pavement Engineering, 11(6), pp. 529-539. 10.1080/10298436.2010.488728
2
Akkinepally, R. and Attoh-Okine, N. (2006). Quality control and quality assurance of hot mix asphalt construction in Delaware.
3
Al-Qadi, I.L., Carpenter, S.H., Leng, Z., Ozer, H. and Trepanier, J. (2008). Tack coat optimization for HMA overlays: Laboratory testing. Illinois Center for Transportation.
4
Ameri, M., Kashani Novin, M. and Yousefi, B. (2014). “Comparison of the field measurements of asphalt concrete densities obtained by ground-penetrating radar, pavement quality indicator and the borehole coring methods”, Road Materials and Pavement Design, 15(4), pp. 759-773. 10.1080/14680629.2014.909874
5
Application of Quality Assurance Specifications for Asphalt Concrete Mixtures (2006). Louisiana department of transportation and development.
6
Asphalt Pavement Inspector's Manual, 2003 edition. Alaska department of transportation and public facilities.
7
Asphalt Quality Management System (2017). North carolina department of transportation.
8
Battikha, M.G. (2003). “Quality management practice in highway construction”, International Journal of Quality & Reliability Management, 20(5), pp. 532-550. 10.1108/02656710310476516
9
Benson, P.E. (1999). “Performance review of a quality control/quality assurance specification for asphalt concrete”, Transportation Research Record, 1654(1), pp. 88-94. 10.3141/1654-10
10
Bubshait, A.A. (2001). “Quality of pavement construction in Saudi Arabia”, Practice Periodical on Structural Design and Construction, 6(3), pp. 129-136. 10.1061/(ASCE)1084-0680(2001)6:3(129)
11
Burati, J.L., Weed, R.M., Hughes, C.S. and Hill, H.S. (2003). Optimal procedures for quality assurance specifications (No. FHWA-RD-02-095). Turner-Fairbank Highway Research Center.
12
Chang, L.M. and Hsie, M. (1995). “Developing acceptance-sampling methods for quality construction”, Journal of Construction Engineering and management, 121(2), pp. 246-253. 10.1061/(ASCE)0733-9364(1995)121:2(246)
13
Chen, D.H. (2009). “Slippage failure of a new hot-mix asphalt overlay”, Journal of Performance of Constructed Facilities, 24(3), pp. 258-264. 10.1061/(ASCE)CF.1943-5509.0000089
14
Chen, Y., Tebaldi, G., Roque, R., Lopp, G. and Su, Y. (2012). “Effects of interface condition characteristics on open-graded friction course top-down cracking performance”, Road Materials and Pavement Design, 13(sup1), pp. 56-75. 10.1080/14680629.2012.657051
15
Clark, T.M., Rorrer, T.M. and McGhee, K.K. (2012). Trackless tack coat materials: a laboratory evaluation for performance acceptance (No. VCTIR 12-R14).
16
Cominsky, R.J., Huber, G.A., Kennedy, T.W. and Anderson, M. (1994). The superpave mix design manual for new construction and overlays (No. SHRP-A-407). Washington, DC: Strategic Highway Research Program.
17
Cominsky, R.J., Killingsworth, B.M., Anderson, R.M., Anderson, D.A. and Crockford, W.W. (1998). Quality control and acceptance of superpave-designed hot mix asphalt (No. Project D9-7 FY'93).
18
Cross, S.A. and Shrestha, P.P. (2004). Guidelines for using prime and tack coats (No. FHWA-CFL-04-001).
19
Deacon, J.A., Monismith, C.L., Harvey, J.T. and Popescu, L. (1997). Pay factors for asphalt-concrete construction: effect of construction quality on agency costs, Report prepared for California Department of Transportation, Pavement Research Center, CAL/APT Program, Institute of Transportation Studies, University of California, Berkeley.
20
Decker (1996). Quality management of hot mix asphalt, American Society of Testing Materials, STP 1299. 10.1520/STP1299-EB
21
Du, J.C. (2011). Evaluation of shear strength on pavement layers by use tack materials, In Advanced Materials Research (Vol. 255, pp. 3176-3179), Trans Tech Publications. 10.4028/www.scientific.net/AMR.255-260.3176
22
Ebrahim Abu El-Maaty, A., Akal, A.Y. and El-Hamrawy, S. (2016). “Management of highway projects in egypt through identifying factors influencing quality performance”, Journal of Construction Engineering, 2016: 4823630. 10.1155/2016/4823630
23
Field Manual for Hot Mix Asphalt (HMA) (2007). Edition, Mississippi department of transportation.
24
Gedafa, D., Hossain, M., Ingram, L.S. and Kreider, R. (2010). “Composite pay index for superpave pavements in Kansas”, In The 11 th International Conference on Asphalt Pavements, NAGOYA, Vol. 5, pp. 31-34.
25
Ghaly, N.F., Ibrahim, I.M. and Noamy, E.M. (2014). “Tack coats for asphalt paving”, Egyptian Journal of Petroleum, 23(1), pp. 61-65. 10.1016/j.ejpe.2014.02.009
26
Hakimzadeh, S., Buttlar, W.G. and Santarromana, R. (2012). “Shear-and tension-type tests to evaluate bonding of hot-mix asphalt layers with different tack coat application rates”, Transportation Research Record, 2295(1), pp. 54-62. 10.3141/2295-07
27
Hall, K.D. and Williams, S.G. (2002). “Establishing variability for hot-mix asphalt construction in Arkansas”, Transportation Research Record, 1813(1), pp. 172-180. 10.3141/1813-21
28
Hearne Jr, T.M., Barbee, C.L. and Helms, L.N. (1996). “Asphalt rideability: Construction control with a straightedge?”, Transportation Research Record, 1543(1), pp. 81-88. 10.1177/0361198196154300110
29
HMA Paving Field Inspection, Iowa Department of Transportation.
30
Horan, R.D., Chang, G.K., Xu, Q. and Gallivan, V.L. (2012). “Improving quality control of hot-mix asphalt paving with intelligent compaction technology”, Transportation Research Record, 2268(1), pp. 82-91. 10.3141/2268-10
31
Hot Mix Asphalt Paving, Indiana Department of Transportation.
32
Hughes, C.S., Moulthrop, J.S., Tayabji, S., Weed, R.M. and Burati, J.L. (2011). Guidelines for quality-related pay adjustment factors for pavements, National Cooperative Highway Research Program, NCHRP Project, (10-79). 10.17226/22656
33
Karamihas, S.M. (2003). Assessment of profiler performance for construction quality control: Phase I.
34
Kim, H., Prezzi, M. and Salgado, R. (2010). Use of dynamic cone penetration and clegg hammer tests for quality control of roadway compaction and construction. 10.5703/1288284314246
35
Ksaibati, K. and Butts, N.E. (2003). Evaluating the impact of QC/QA programs on asphalt mixture variability (No. MPC Report No. 03-146). Department of Civil and Architectural Engineering, University of Wyoming.
36
Leng, Z., Ozer, H., Al-Qadi, I. and Carpenter, S. (2008). “Interface bonding between hot-mix asphalt and various Portland cement concrete surfaces: laboratory assessment”, Transportation Research Record: Journal of the Transportation Research Board, (2057), pp. 46-53. 10.3141/2057-06
37
Li, N., Haas, R. and Xie, W.C. (1997). “Development of a new asphalt pavement performance prediction model”, Canadian Journal of Civil Engineering, 24(4), pp. 547-559. 10.1139/l97-001
38
Lin, S., Ashlock, J.C. and Williams, R.C. (2016). “Nondestructive quality assessment of asphalt pavements based on dynamic modulus”, Construction and Building Materials, 112, pp. 836-847. 10.1016/j.conbuildmat.2016.02.189
39
Liu, D., Lin, M. and Li, S. (2016). “Real-time quality monitoring and control of highway compaction”, Automation in Construction, 62, pp. 114-123. 10.1016/j.autcon.2015.11.007
40
Mayakaduwa, K.W. (2011). A Study on quality control and assurance measures in using asphalt concrete.
41
Miller, S.R., Hartmann, T. and Doree, A.G. (2011). “Measuring and visualizing hot mix asphalt concrete paving operations”, Automation in construction, 20(4), pp. 474-481. 10.1016/j.autcon.2010.11.015
42
Minchin, R.E., Hammons, M.I. and Ahn, J. (2008). “A construction quality index for highway construction,” Construction Management and Economics, 26(12), pp. 1313-1324. 10.1080/01446190802621036
43
MNDOT Bituminous Manual. Minesota Department of Transportation.
44
Mohammad, L.N., Hassan, M. and Patel, N. (2011). “Effects of shear bond characteristics of tack coats on pavement performance at the interface”, Transportation Research Record, 2209(1), pp. 1-8. 10.3141/2209-01
45
Mohammad, L., Elseifi, M., Bae, A., Patel, N., Button, J. and Scherocman, J. (2012). NCHRP report 712: optimization of tack coat for HMA placement, Transportation Research Board of the National Academies, Washington, D.C.
46
Ohrn, L.G. and Schexnayder, C. (1998). “Performance-related specifications for highway construction”, Journal of Construction Engineering and Management, 124(1), pp. 25-30. 10.1061/(ASCE)0733-9364(1998)124:1(25)
47
Patel, A., Thompson, M., Harm, E. and Sheftick, W. (1997). “Developing QC/QA specifications for hot mix asphalt concrete in Illinois”, Transportation Research Record, 1575(1), pp. 66-74. 10.3141/1575-10
48
Pathomvanich, S. (2000). Assessment of the effectiveness of quality assurance construction specifications for asphaltic concrete pavement, Doctoral dissertation, State University System of Florida.
49
Paul, H. and Scherocman, J. (1998). “Friction testing of tack coat surfaces”, Transportation Research Record: Journal of the Transportation Research Board, (1616), pp. 6-12. 10.3141/1616-02
50
Petkevičius, K. and Sivi1evičius, H. (2008). “Necessary measures for ensuring the quality of hot mix asphalt in Lithuania”, Baltic Journal of Road & Bridge Engineering (Baltic Journal of Road & Bridge Engineering, 3(1). 10.3846/1822-427X.2008.3.29-37
51
Pratico, F.G. (2007). “Quality and timeliness in highway construction contracts: a new acceptance model based on both mechanical and surface performance of flexible pavements”, Construction Management and Economics, 25(3), pp. 305-313. 10.1080/01446190601042426
52
Principles of Construction of Quality Hot Mix Asphalt Pavements (1982). FHWA-80-R-00426, August 1982.
53
Quality Control Manual for Hot Mix Asphalt for the Quality Control Quality Assurance Process (2009). California Department of Transportation
54
Raposeiras, A.C., Castro-Fresno, D., Vega-Zamanillo, A. and Rodriguez-Hernandez, J. (2013). “Test methods and influential factors for analysis of bonding between bituminous pavement layers”, Construction and Building Materials, 43, pp. 372-381. 10.1016/j.conbuildmat.2013.02.011
55
Roberts, F.L., Kandhal, P.S., Brown, E.R., Lee, D.Y. and Kennedy, T.W. (1991). Hot mix asphalt materials, mixture design and construction.
56
Schmitt, R.L., Russell, J.S., Hanna, A.S., Bahia, H.U. and Jung, G.A. (1998). “Summary of current quality control/quality assurance practices for hot-mix asphalt construction”, Transportation Research Record, 1632(1), pp. 22-31. 10.3141/1632-03
57
Shekharan, R., Frith, D., Chowdhury, T., Larson, C. and Morian, D. (2007). “Effects of comprehensive quality assurance/quality control plan on pavement management”, Transportation Research Record, 1990(1), pp. 65-71. 10.3141/1990-08
58
Shuler, S., Aschenbrener, T. and DeDios, R. (2007). “Effect of performance warranties on cost and quality of asphalt pavements”, Transportation Research Record, 2040(1), pp. 100-106. 10.3141/2040-11
59
Smith, K.L., Titus-Glover, L. and Evans, L. (2002). Pavement smoothness index relationships, Final Report (No. FHWA-RD-02-057). United States. Federal Highway Administration. Office of Pavement Technology.
60
Standard Specifications for Highway Construction, 2008 edition, Alabama.
61
Stroup-Gardiner, M., Carter, A., Das, T. and Bowman, B. (2005). “Initial ride quality of hot-mix asphalt pavements”, Transportation Research Record, 1907(1), pp. 104-112. 10.1177/0361198105190700112
62
Suh, Y.C., Kwon, S.A., Kim, G.Y. and Lim, K.S. (2009). “Development of pavement condition index for Korean asphalt national highway and decision criteria for resurfacing”, International Journal of Pavement Research and Technology, 2(3), pp. 106-114.
63
Taute, A., Pretorius, D., Marais, H. and Grobler, J. (2007). Hot mix asphalt control, In: Proceedings of the 9th Conference on Asphalt Pavements for Southern Africa, Gaborone, Botswana.
64
Thurner, H. F. (2001). “Quality assurance and self control in road construction, advanced measurement technology”, In 4th International Symposium Infrastructure Construction Systems and Technologies, pp. 73-81.
65
Tsai, B.W. and Monismith, C.L. (2009). “Quality control-quality assurance sampling strategies for hot-mix asphalt construction”, Transportation Research Record, 2098(1), pp. 51-62. 10.3141/2098-06
66
Wagner, C.T. (2003). “A comparison of devices used to measure smoothness of newly constructed HMA pavements”, In Constructing Smooth Hot Mix Asphalt (HMA) Pavements. ASTM International.
67
Wegman, D.E. (1996). “Minnesota's quality management program “A process for continuous improvement””, In Quality Management of Hot Mix Asphalt. ASTM International.
68
Welborn, J. (1984). State-of-the-art in asphalt pavement specifications: executive summary (No. FHWA-RD-83-XXX). Turner-Fairbank Highway Research Center.
69
West, R.C., Zhang, J. and Moore, J. (2005). Evaluation of bond strength between pavement layers. NCAT Report, 05-08.
70
Wu, X.H., Yan, J., Tian, M.M. and Luo, D.S. (2017). “Study on the Design and Construction Quality Control of AC-13 Rubber Asphalt Pavement”, In Key Engineering Materials, Trans Tech Publications, Vol. 753, pp. 310-314. 10.4028/www.scientific.net/KEM.753.310
71
Xu, Q. and Chang, G.K. (2016). “Adaptive quality control and acceptance of pavement material density for intelligent road construction”, Automation in Construction, 62, pp. 78-88. 10.1016/j.autcon.2015.11.004
72
Yiqiu, T., Haipeng, W., Shaojun, M. and Huining, X. (2014). “Quality control of asphalt pavement compaction using fibre Bragg grating sensing technology”, Construction and Building Materials, 54, pp. 53-59. 10.1016/j.conbuildmat.2013.12.032
73
Zambrano, C., Drnevich, V.P. and Bourdeau, P.L. (2006). Advanced compaction quality control. 10.5703/1288284313408
74
Ziari, H. and Khabiri, M.M. (2007). “Interface condition influence on prediction of flexible pavement life”, Journal of Civil Engineering and Management, 13(1), pp. 71-76. 10.3846/13923730.2007.9636421
Information
  • Publisher :KOREAN ASPHALT INSTITUTE
  • Publisher(Ko) :한국아스팔트학회
  • Journal Title :Journal of the Korean Asphalt Institute
  • Journal Title(Ko) :한국아스팔트학회지
  • Volume : 10
  • No :2
  • Pages :172-195
  • Received Date : 2020-11-18
  • Revised Date : 2020-12-04
  • Accepted Date : 2020-12-16